ALYORK | METAL & ENERGYALYORK | METAL & ENERGYALYORK | METAL & ENERGY

  • HOME
  • ABOUT US
  • SOLUTIONS
    • Energy Solutions
    • Iron-Steel Slolutions
    • Technological Equipments
    • Materials
  • REFERENCES
  • INQUIRIES
  • NEWS
  • CONTACT US

SOLUTIONS

ALYORK ENGINEERING & CONSULTANCY LTD.
News
24 February 2017
Hits: 1853

AKSA Energy- BOLU, Göynük Thermal Power Plant Project

  • Print
  • Email

The groundbreaking ceremony for KAZANCI HOLDING- AKSA ENERGY’S 270 MW power plant based on local coal took place

on 13th of July 2012 with participation of the Energy and Natural Resources Minister Mr. Taner Yıldız, KAZANCI Holding CEO Mr. Cemil Kazancı, CEOs and senior executives from SKODA and SES, ALYORK and AKSA Enerji officials, as well as local public.

The total cost of the investment has reached 485 million $. CFBs and turbines will be provided by Czech SKODA POWER and Slovak SES TLMACE, both of which are represented by ALYORK in Turkey.

  • Prev
  • Next

Copyright © 1991-2017 Alyork Engineering & Consultance Ltd.

  • HOME
  • ABOUT US
  • SOLUTIONS
    • Energy Solutions
    • Iron-Steel Slolutions
    • Technological Equipments
    • Materials
  • REFERENCES
  • INQUIRIES
  • NEWS
  • CONTACT US