SOLUTIONS

Yildizlar Holding 3S Enerji Cankiri Orta TPP Boilers

Print

The 3x365t/h boiler contract was signed between SES Tlmace from Slovakia represented by Alyork and Yildizlar Holding

3S Enerji ve Maden A.Ş. Cankiri Orta Thermal Power Plant will have 400MW total installed capacity. Cankiri Orta Thermal Power Plant will be the higest capacity circulating fluidized bed(CFB) type thermal power plant to be established in Turkey up to now.